<b id="37qa7"><address id="37qa7"></address></b>

<u id="37qa7"><address id="37qa7"><meter id="37qa7"></meter></address></u>
<u id="37qa7"><small id="37qa7"></small></u>
Service Tel: 0472-6916-218
English
News
 
News News
熱門關鍵詞:
Current location:Home > News > Industry Trends
News
Current location:Home > News > Industry Trends
Industry TrendsCurrent location:Home > News > Industry Trends

Baotou iNST Magnetic New Materials Co., Ltd. Surface Treatment Plant Upgrading, Reconstruction and E

author:官方發布│Industry Trends
2022-05-04

1. Name and Summary of Construction Project

1.1 Project Name

Surface Treatment Plant Upgrading, Reconstruction, and Expansion Project of Baotou Inst Magnetic New Materials Co., Ltd.

1.2 Construction Location

The construction site of the project is located at A3, A6, D1, D2 and C4 plants in the Rare Earth New Materials Deep Processing Base in the Hope Industrial Park of Baotou Rare Earth High tech Industrial Development Zone. The geographical coordinates of A3 factory building are 109° 46′ 38.18094″ E, 40° 35′ 1.64308″ N, A6 factory building are 109° 46′ 42.51858″ E, 40°35′ 5.2323 ″ N, D1 factory building is 109° 46′ 42.03893″ E, 40° 34′ 58.52608″ N, D2 factory building is 109° 46′ 41.92306″ E, 40° 34′ 57.17425″ N, the geographical coordinates of the C4 factory building are 109° 46′ 37.57261″ E and 40° 34′ 53.65760″ N.

1.3 Main Construction Content and Scale

The main construction content and scale of this project are as follows:

Project construction of electroplating production lines in the A3, A6, D1, D2 rare earth new materials deep processing base, construction of chamfering production line in C4 plant. after completion of the total construction scale of nickel-copper-nickel 282.1t/a, galvanized 203.29t/a, phosphate electrophoresis 114.89t/a, nickel-copper-nickel (test line) 7t/a, anodic oxidation 25t/a, spraying 50t/a, nickel-copper-nickel 650t/a, nickel-copper-nickel plus chemical nickel 400t/a, vacuum aluminum plating 20t/a.

1.4 Total investment of the project

The total investment of the project is estimated to be 80 million yuan, including 60 million yuan of fixed assets investment and 20 million yuan of working capital.

2. Construction Unit and Contact Information

Construction Unit Name: Baotou Inst Magnetic New Materials Co., Ltd.

Contact Tel: 18547213488

Contact Person: Xu Baowen

3.Environmental Assessment Organization Name and Contact Information

Environmental Assessment Unit: Inner Mongolia Huatai Hanguang Environmental Technology Co., Ltd

Address: 701, Block C, Times Square, No. 86 Huanghe Street, Rare Earth High tech Zone, Baotou, Inner Mongolia

Contact person: Dong Yuying  Contact Tel: (0472) 5237678

Email address: 906120139@qq.com

4 Ways for the public to provide opinions

Questionnaire survey, please fill out the public opinion form for the environmental impact assessment of the construction project. The web link to the public opinion form: https://pan.baidu.com/s/1q44OTodrS6y_VtxRweACWA (Extract code: ug5r)

5 Ways and means to submit public opinion forms

The public can submit comment forms by mail, e-mail, WeChat and other ways and means.


Baotou Inst Magnetic New Materials Co., Ltd.

May 4, 2022


91在线无码精品秘 入口导航_人妻人人澡人人添人人爽冫 一_无码人妻一级二三区免费视频_日本a在线观看

<b id="37qa7"><address id="37qa7"></address></b>

<u id="37qa7"><address id="37qa7"><meter id="37qa7"></meter></address></u>
<u id="37qa7"><small id="37qa7"></small></u>